IBM Rule 34A Mining Surveys with Submission-Ready Reports in 48 Hours
Non-compliant survey reports get rejected by IBM and DGMS and every rejection means penalties, delayed approvals, and scrutiny on your lease operations. Our DGCA-certified teams survey your mine or quarry lease area, process all data in-house, and deliver IBM Rule 34A compliant orthomosaics, volumetric reports, and full documentation packages within 48 hours formatted for direct submission, without rework.

IBM Rule 34A Survey Package
Structured for mine operators who need accurate, repeatable, and compliant outputs.
IBM SOP Aligned Flight Planning
Pre-survey planning aligned with IBM survey and documentation requirements.
Survey-Grade Accuracy
On-site capture at 5cm GSD or better with high-resolution mechanical shutter sensors.
GCP Strategy
Ground control placement and checkpoints planned for reliable accuracy verification.
Submission-Ready Reports
Orthomosaic, DSM/DTM, mine plan overlay, and compliance-ready report package.
What You Receive
India Mining Compliance Support
Specialized documentation for DGMS, IBM, and state mining authority requirements across India.
DGMS Compliance Support
Survey data formatted to support DGMS inspection requirements with measured slope angles, bench widths, and crest positions compared against design standards.
IBM Rule 34A Documentation
Complete documentation package for IBM annual returns including mine plan progress, volume reports, and georeferenced survey records.
State Mining Authority Reporting
Compliance-ready reports for state mining authorities with quantified extraction volumes and environmental monitoring records.
Regulatory Audit Support
All survey data is georeferenced, time-stamped, and traceable - defensible in DGMS and IBM audits.
What We Survey
Use-case coverage across production, compliance, and planning.
Stockpile Volume Measurement
Accurate volume calculations for ore, coal, and overburden stockpiles with periodic tracking.
Pit Progression Monitoring
Track excavation progress, benchmark against mine plans, and monitor bench development.
IBM Rule 34A Compliance
Quarterly and annual survey packages for lease documentation and regulatory submissions.
Dump and Waste Monitoring
Track dump volumes, monitor slope conditions, and support environmental compliance checks.
Haul Road and Ramp Planning
Design support with cut/fill insights and terrain-based haul route planning.
Blast Planning and Analysis
Pre-blast terrain capture and post-blast volume analysis to optimize blast outcomes.
What a Mine Survey Visit Looks Like
Pre-Survey Planning
Mine plan review, flight planning, GCP design, and airspace approvals before mobilization.
On-Site Survey
RTK drone deployment with controlled capture workflow and on-site quality checks.
Processing and Analysis
Cloud processing for orthomosaic generation, terrain models, and volumetric outputs.
Delivery and Support
Secure delivery, report walkthrough, and support for IBM compliance submission.
Quarterly Survey Retainer
Fixed annual engagement for ongoing compliance, stockpile tracking, and progression monitoring.
Frequently Asked Questions
Common questions about mining and quarry drone surveys
IBM Rule 34A mandates periodic surveying of mining leases to track excavation, stockpiles, and ensure regulatory compliance. Our surveys provide submission-ready documentation with accurate volumetric reports and geo-referenced maps required by mining authorities.