Mining and Quarry Survey Service

IBM Rule 34A Compliant Mining Surveys, from Flight to Final Report

DGCA-certified teams survey your lease area, process data in-house, and deliver submission-ready IBM Rule 34A outputs within 48 hours without adding software burden to your team.

IBM Rule 34A Survey Package

Structured for mine operators who need accurate, repeatable, and compliant outputs.

IBM SOP Aligned Flight Planning

Pre-survey planning aligned with IBM survey and documentation requirements.

Survey-Grade Accuracy

On-site capture at 5cm GSD or better with high-resolution mechanical shutter sensors.

GCP Strategy

Ground control placement and checkpoints planned for reliable accuracy verification.

Submission-Ready Reports

Orthomosaic, DSM/DTM, mine plan overlay, and compliance-ready report package.

What You Receive

IBM Rule 34A compliant orthomosaic
Volumetric reports (stockpiles, pits, dumps)
DSM/DTM with 2-5cm accuracy
Mine plan overlay with coordinates
Pit progression comparison reports
Bench geometry analysis
Compliance certificate for submission
GeoTIFF, DXF, LAS, PDF formats

What We Survey

Use-case coverage across production, compliance, and planning.

Stockpile Volume Measurement

Accurate volume calculations for ore, coal, and overburden stockpiles with periodic tracking.

Pit Progression Monitoring

Track excavation progress, benchmark against mine plans, and monitor bench development.

IBM Rule 34A Compliance

Quarterly and annual survey packages for lease documentation and regulatory submissions.

Dump and Waste Monitoring

Track dump volumes, monitor slope conditions, and support environmental compliance checks.

Haul Road and Ramp Planning

Design support with cut/fill insights and terrain-based haul route planning.

Blast Planning and Analysis

Pre-blast terrain capture and post-blast volume analysis to optimize blast outcomes.

What a Mine Survey Visit Looks Like

01

Pre-Survey Planning

Mine plan review, flight planning, GCP design, and airspace approvals before mobilization.

02

On-Site Survey

RTK drone deployment with controlled capture workflow and on-site quality checks.

03

Processing and Analysis

Cloud processing for orthomosaic generation, terrain models, and volumetric outputs.

04

Delivery and Support

Secure delivery, report walkthrough, and support for IBM compliance submission.

Quarterly Survey Retainer

Fixed annual engagement for ongoing compliance, stockpile tracking, and progression monitoring.

4 planned surveys per year
20-30% savings vs individual surveys
Priority scheduling and processing
Dedicated account manager

Frequently Asked Questions

Common questions about mining and quarry drone surveys

IBM Rule 34A mandates periodic surveying of mining leases to track excavation, stockpiles, and ensure regulatory compliance. Our surveys provide submission-ready documentation with accurate volumetric reports and geo-referenced maps required by mining authorities.

Cloud Platform

Already Have Drone Data?

Process your imagery on our cloud platform without desktop software or GPU setup.

Ready to Get Started?

Ready for Your Mine Survey?

Request a quote based on lease area and compliance scope. Get a response within 2 hours.

2-Hour Response Time
DGCA Certified
Pan-India Coverage